Engineers & contractors · Nagpur, India
Erection ofall kinds ofboilers.Including special class.
For oil, gas, steel and power plants. 60 projects across India since 2000.

- On site since
- 2000
- Projects in the portfolio
- 60
- Engineers, supervisors and workmen
- 238
- Turnover, 2022–23
- ₹15 Cr
What we take on at site.
Mechanical and civil project works, from the first column to the hydro test. Our own cranes, welding sets and a trained crew move from one plant to the next.
01
Boiler erection
Erection of all kinds of boilers, including special class: CFBC, AFBC, WHRB, WHRS, recovery and spent-wash. Structure and pressure parts, on units up to 500 TPH.
02
Piping
Fabrication and erection of pressure piping: LP, CW and ACW, DM water and boiler trim piping, in pipe up to 4.5 m diameter.
03
Structures & equipment
TG structures, pipe racks, bunkers, track hoppers, tanks and turbine condenser work, fabricated and erected.
04
ESP, bag filters & ducting
Electrostatic precipitators, bag filters, scrubbers, air pre-heaters and ducting for power, steel and cement plants.
05
Shutdown & retrofit
Shutdown and modification jobs: economiser coil and APH replacement, ESP to bag filter conversion, revamps.
06
Commissioning
Boiler and ESP commissioning, hydro tests and stress relieving with our own pumps and SR units.
60 jobs, from Jamnagar to Oman.
The full list from our company profile, newest first. Much of it is repeat work for the same boiler makers and EPC contractors.
We have worked for: Thermax · TBWES · Power Mech · Shapoorji Pallonji · Greens Power Equipment · Geo Miller · A2Z Powercom · My Home Industries · Uttam Galva
- 60
SMW Ispat Ltd.Deoli, Wardha, Maharashtra
2023–24
Client: SMW Ispat Ltd.
2 × 71 TPH WHRB boilers
- 59
My Home Industries Ltd.Melachuru
2023–24
Client: My Home Industries Ltd.
WHRS 25 × 1 PH boiler
- 58
Phil Steel Ltd.
2023–24
Client: Phil Steel Ltd.
1 × 42 TPH WHRB and 1 × 40 TPH AFBC boilers
- 57
Kusum Smelters Pvt. Ltd.
2023–24
Client: Kusum Smelters Pvt. Ltd.
2 × 42 TPH WHRB boilers
- 56
My Home Industries Ltd.Melachuru
2023
Client: My Home Industries Ltd.
WHRS boiler erection
- 55
Dalmia Cement Ltd.Chandrapur, Maharashtra
2022–23
Client: TBWES Ltd.
WHRS boiler erection
- 54
Uttam Value MetalicksWardha, Maharashtra
2022
Client: Uttam Galva
FM boiler erection
- 53
Sunderlalji Lokenete SakharBeed, Maharashtra
2021–22
Client: Sunderlalji Lokenete
Spent wash boiler erection
- 52
Dalmia Cement Ltd.Dehri-on-Sone, Bihar
2021–22
Client: TBWES Ltd.
WHRS boiler erection
- 51
Rungta Mines Ltd.Barbil, Odisha
2019–21
Client: TBWES Ltd.
WHRB boiler erection
- 50
PDOOman
2018
Client: Thermax Ltd.
Pipe fabrication
- 49
OCL India Ltd.Rajgangpur, Odisha
2018
Client: Thermax Enviro Division
Shutdown: ESP conversion to bag filter, duct and fan
Show the other 48 projects
- 48
Sterlite TechAurangabad, Maharashtra
2018
Client: Thermax Enviro Division
Bag filter and scrubber erection and commissioning
- 47
Tata TinplateJamshedpur, Jharkhand
2017–18
Client: Thermax Enviro Division
ESP erection and commissioning
- 46
RSPLDwarka, Gujarat
2017–18
Client: Thermax Ltd.
CFBC boiler erection
- 45
Sadhu Vaswani Mission
2017
Client: Elina Solution Pvt. Ltd.
25 kW rooftop project
- 44
Godrej Ltd.Chittoor, Andhra Pradesh
2017
Client: Elina Solution Pvt. Ltd.
2.2 MW power plant, green land project
- 43
Anjani CementSolar power plant project
2016
Client: Thermax Ltd.
Boiler erection and commissioning
- 42
Deepak FertilisersPanvel, Maharashtra
2016–17
Client: Thermax Ltd.
Retrofit job
- 41
IOTEPL
2015–16
Client: Thermax Ltd.
500 TPH CFBC boiler erection
- 40
IBPLMudhaval, Karnataka
2015–16
Client: Thermax Ltd.
APH replacement & interconnecting piping
- 39
RUPL, Unit No. 5Hazira, Gujarat
2015–16
Client: Thermax Ltd.
Boiler erection and commissioning
- 38
SPGCLRaigarh, Chhattisgarh
2015–16
Client: Sokeo Power Pvt. Ltd.
ESP erection and commissioning
- 37
SPGCLRaigarh, Chhattisgarh
2014–15
Client: Sokeo Power Pvt. Ltd.
Bunker & piping erection
- 36
Wonder CementChittorgarh, Rajasthan
2014–15
Client: Thermax Ltd.
Shutdown and modification
- 35
Bajaj Energy Ltd.Gonda, Uttar Pradesh
2014
Client: Thermax Ltd.
Shutdown and modification
- 34
Orient Paper MillShahdol, Madhya Pradesh
2014
Client: Thermax Ltd.
Shutdown and modification
- 33
Minakshi PowerNellore, Andhra Pradesh
2014
Client: Thermax Ltd.
Shutdown and modification
- 32
Suryadev Steel and PowerGummidipoondi, Tamil Nadu
2014
Client: Thermax Ltd.
Shutdown and modification
- 31
Kamachi Steel and IronGummidipoondi, Tamil Nadu
2014
Client: Thermax Ltd.
Shutdown and modification
- 30
RKM PowergenKharsia, Chhattisgarh
2013–14
Client: Greens Power Equipment Pvt. Ltd.
Pipe rack fabrication & erection
- 29
K.G.P.U.L.Miryalaguda, Andhra Pradesh
2012–14
Client: Sokio Power Pvt. Ltd.
1 × 65 MW China boiler structure & pressure part erection
- 28
Ind-BarathJharsuguda, Odisha
2013–14
Client: Sokio Power Pvt. Ltd.
2 × 360 MW turbine condenser work
- 27
Vicat Sagar CementGulbarga, Karnataka
2012–13
Client: Greens Power Equipment Pvt. Ltd.
WHRB boiler structure & pressure part erection
- 26
HindalcoRenukoot, Uttar Pradesh
2012
Client: Greens Power Equipment Pvt. Ltd.
Boiler economiser coil dismantling & erection
- 25
Suryalaxmi Cotton Mills Ltd.Ramtek, Nagpur, Maharashtra
2011
Client: Limra Tech Engineers, Delhi
AFBC boiler structure & pressure part erection
- 24
A2Z Powercom Pvt. Ltd.Nakodar, Punjab
2010
Client: A2Z Powercom Pvt. Ltd.
75 TPH CFBC boiler structure fabrication & erection
- 23
A2Z Powercom Pvt. Ltd.Fazilka, Punjab
2010
Client: A2Z Powercom Pvt. Ltd.
75 TPH CFBC boiler structure fabrication & erection
- 22
Abhijeet PowerHingna, Nagpur, Maharashtra
2011
Client: D.F. Power Pvt. Ltd.
Boiler commissioning (China)
- 21
Bajaj Energy Ltd.Gonda, Uttar Pradesh
2010
Client: Thermax Ltd. / Limra Tech Engineers, Delhi
190 TPH CFBC boiler structure & pressure part erection
- 20
BILT Power Ltd.Ballarpur, Chandrapur, Maharashtra
2009
Client: Thermax Ltd.
Shutdown: air pre-heater & ducting
- 19
B.M.M. Ispat Ltd.Hospet, Karnataka
2009
Client: Thermax Ltd.
WHRB boiler pressure part & ducting erection
- 18
Abhijeet PowerHingna, Nagpur, Maharashtra
2009
Client: D.F. Power Pvt. Ltd. / Dapson Engineering Pvt. Ltd.
Boiler pressure parts (China)
- 17
Abhijeet PowerHingna, Nagpur, Maharashtra
2009
Client: D.F. Power Pvt. Ltd. / Ragmet Engineering Pvt. Ltd.
Boiler structure & pressure part erection (China)
- 16
Wardha Power Ltd.Warora, Maharashtra
2008
Client: Sangha Erector Pvt. Ltd.
135 MW ESP erection (China)
- 15
Bombay Rayon Fashions Ltd.Tarapur, Maharashtra
2008
Client: Ragmet Engineering Pvt. Ltd.
AFBC boiler erection, structure & pressure parts
- 14
BILT Power Ltd.Ballarpur, Chandrapur, Maharashtra
2008
Client: Ragmet Engineering Pvt. Ltd.
160 TPH CFBC boiler erection (Thermax), structure & pressure parts
- 13
Grasim CementKotputli, Rajasthan
2008
Client: Ragmet Engineering Pvt. Ltd.
110 TPH CFBC boiler erection (Thermax), structure & pressure parts
- 12
V.T.P.S.Vijayawada, Andhra Pradesh
2007
Client: Sangha Erector Pvt. Ltd.
TG structure fabrication & erection
- 11
S.P.M.Sirpur Kagaznagar, Andhra Pradesh
2007
Client: Ragmet Engineering Pvt. Ltd.
Recovery boiler & ESP erection (BHEL)
- 10
K.P.C.L.Bellary, Karnataka
2006
Client: Ragmet Engineering Pvt. Ltd.
LP piping fabrication & erection
- 09
K.P.C.L.Bellary, Karnataka
2006
Client: Geo Miller & Co. Pvt. Ltd.
DM water piping (BHEL)
- 08
K.P.C.L.Bellary, Karnataka
2006
Client: Tacxel Engineering Pvt. Ltd.
500 MW boiler trim piping (BHEL)
- 07
K.P.C.L.Bellary, Karnataka
2006
Client: Sangha Erector Pvt. Ltd.
CW piping erection (BHEL)
- 06
A.D.H. Ltd.Manali, Himachal Pradesh
2005
Client: Sangha Erector Pvt. Ltd.
4.5 m dia pipe fabrication & erection
- 05
BALCOKorba, Chhattisgarh
2005
Client: Sangha Erector Pvt. Ltd.
LP piping, CW & ACW piping (SEPCO)
- 04
BALCOKorba, Chhattisgarh
2004
Client: Shapoorji Pallonji Co. Ltd.
Track hopper & compressor house (SEPCO)
- 03
M.P.E.B.Sarni, Betul, Madhya Pradesh
2003
Client: Power Mech Pvt. Ltd.
210 MW ducting & coil piping
- 02
Jindal Steel & Power Ltd.Raigarh, Chhattisgarh
2002
Client: Power Mech Pvt. Ltd.
WHRB boiler (Thermax), structure & pressure parts
- 01
Reliance PetroleumJamnagar, Gujarat
2000
Client: U.B. Engineering
Oil pressure piping fabrication & erection
Our own crew. Our own cranes.
238 people on the rolls and the tools, tackles and lifting gear to keep them working, so a job does not wait on hired equipment.
Site staff
- Project manager
- 1
- Site in-charge
- 4
- Site engineers
- 8
- Site supervisors
- 8
- Safety supervisors
- 4
- Store keepers
- 4
- Accountants
- 2
Workmen
- Riggers
- 45
- Khalasis
- 40
- Fitters
- 28
- Welders
- 28
- Grinders
- 20
- TIG welders
- 12
- IBR welders
- 10
- Fabricators
- 10
- Gas cutters
- 10
- Electricians
- 4
Tools, tackles & machinery
- Tyre-mounted crane, 160 ton
- 1
- Tyre-mounted crane, 110 ton
- 1
- Tyre-mounted crane, 90 ton
- 1
- Tyre-mounted crane, 80 ton
- 1
- Tyre-mounted crane, 50 ton
- 1
- Farana cranes, F-160 / F-23
- 3
- 20 ton trailer
- 1
- Motorised winch, 10 MT
- 1
- Motorised winch, 5 MT
- 2
- Manual winch, 10 MT
- 2
- Chain pulley blocks, 1 / 2 / 5 / 10 MT
- 150
- Welding rectifiers
- 75
- Welding inverters, 400 A
- 40
- SAW welding set
- 1
- MIG welding set
- 1
- Plasma cutting machine
- 1
- Plasma cutting machine, 10 mm capacity
- ✓
- Pug cutting machines
- 8
- Cutting machine
- 1
- Grinding machines, AG7 / AG5 / AG4 / GQ4 / FF2
- 120
- Plate bending machine, 2.5 m × 12 mm
- 1
- Plate bending machine, 2 m × 20 mm
- ✓
- Tube bending machines
- 2
- Tube expanding machines
- 2
- Radial drill machines
- 2
- Drill machines with stand, 50 mm dia
- 2
- Drill machine with stand, 80 mm dia
- 1
- Magnetic drill machines, 31 mm dia
- 3
- Motorised hydro test pumps
- 2
- Manual hydro test pumps
- 6
- SR units with attachment and recorder
- 2 sets
- Scaffolding pipes
- 6,000
- Scaffolding pipe clamps
- 10,000
- Scaffolding jali
- 350
- Manila rope and wire rope pulleys
- Sufficient
- Manila rope (rolls)
- Sufficient
- Hand tools
- Sufficient
Qualified welds. Tested joints.
Established WPS / PQR
- SMAW for CS plates with E-6013 electrodes
- SMAW for CS plates with E-7018 electrodes
- SMAW for SS-304 plates with ER 316L
- SMAW for CS pipes, small and large bore, with E-6010 / E-7018 electrodes
- GTAW for CS and SS pipes
- MIG for CS and SS plates and pipes
NDT facilities
- Dye penetrant test
- Acid etching test
- Pneumatic test
- Stress relieving (PWHT, SR)
- Pre-heating examination
- Post-heating examination
- Radiography (outsourced)
Safety is budgeted into the work.
Vision
To carry out every job to the client's expectation: meeting the specified requirements and international standards, developing work procedures suited to each project, and giving the best performance at the most economical price. We train our people to keep pace with the latest technology in the industry.
Health & safety
We are committed to the health and safety of our manpower and equipment, and to the highest safety standards through awareness, training and motivation. Healthy equipment and well-informed, motivated personnel lead to efficient and safe production.
Environment
We run our operations in a manner compatible with the environmental and economic development of the community, and make sure our employees follow the rules framed under our environmental management system.
Zero compromise
Our highest priority is the safety of both men and material. We adhere to all standard safety norms, safety gadgets and training for the work undertaken. A compromise on safety, under any circumstance, is not tolerable.
Have a job coming up?
Send the scope. We will come back with manpower, schedule and a quote.
- Call S. K. Pandey
- +91 93727 11144
- Head office
- Plot No. 08, House No. 849, MahajanwadiHingna Road, near Palkar SabhagruhNagpur, Maharashtra 441110